0% Plagiarism Guaranteed & Custom Written

1. Plan job. 1.1. Task to be undertaken is assessed.

01 / 10 / 2021 Essays & Coursework 1

This paper circulates around the core theme of 1. Plan job. 1.1. Task to be undertaken is assessed. together with its essential aspects. It has been reviewed and purchased by the majority of students thus, this paper is rated 4.8 out of 5 points by the students. In addition to this, the price of this paper commences from £ 99. To get this paper written from the scratch, order this assignment now. 100% confidential, 100% plagiarism-free.

Elements and Performance Criteria

ELEMENT 

PERFORMANCE CRITERIA 

1. Plan job.

1.1. Task to be undertaken is assessed.

1.2. Potential workplace hazards  are identified.

1.3. Hazard control measures  are identified consistent with appropriate standards  to ensure the safety of personnel and equipment.

1.4. Site information is obtained.

1.5. All forces and loads  associated with erecting and dismantling structures  and associated plant  are considered in consultation with appropriate personnel .

1.6. Rigging equipment  and associated equipment  are identified in consultation with appropriate personnel according to procedures  and site information.

1.7. Safety equipment is identified.

1.8. Appropriate communication methods  are identified with appropriate personnel.

2. Select and inspect equipment.

2.1. Rigging equipment and associated equipment are selected and inspected according to procedures and the appropriate standard.

2.2. Safety equipment is selected and inspected according to procedures.

2.3. All defective rigging equipment, associated equipment and safety equipment is isolated, reported and recorded according to procedures.

2.4. Communication equipment  is selected and inspected for serviceability (where applicable.

3. Set up task.

3.1. Appropriate hazard prevention /control measures  are applied to the work area according to procedures.

3.2. Ground suitability  is inspected and checked (where appropriate).

3.3. Site information is reviewed, interpreted and communicated to appropriate personnel and appropriate personnel .

3.4. All forces and loads associated with erecting and dismantling structures and associated plant are determined in consultation with appropriate personnel.

3.5. Safety equipment is fitted and worn correctly (where appropriate).

3.6. Rigging equipment and associated plant are positioned for work application and stability according to procedures.

3.7. Methods of applying temporary connections  using fibre rope are applied according to procedures and the appropriate standard.

4. Erect structures and plant.

4.1. Structures and associated plant are erected according to procedures and site information.

4.2. Stability of structures and associated plant is maintained during erection according to procedures.

4.3. Work is conducted safely at heights including safe and effective use of safety equipment.

4.4. Appropriate communication methods and communication equipment, are used to co-ordinate the tasks.

4.5. Associated plant and rigging equipment is used according to procedures and the appropriate standard.

4.6. Temporary guys, ties, propping and shoring, including flexible steel wire rope , and tubing, are connected where required.

4.7. Associated equipment is used in a safe and appropriate manner.

4.8. The completed task is inspected according to the appropriate standard.

4.9. Excess materials are removed from the work area (where applicable).

5. Dismantle structures and plant.

5.1. Structures and associated plant are dismantled according to procedures and the appropriate standard.

5.2. Work is conducted safely at heights including safe and effective use of safety equipment.

5.3. Stability of structures and associated plant is maintained during dismantling according to procedures.

5.4. Rigging equipment, associated equipment, safety equipment and associated plant are inspected for damage and defects.

5.5. All defective rigging equipment, associated equipment, associated plant and safety equipment are isolated reported and recorded according to procedures.

5.6. Rigging equipment and associated equipment are stored. according to procedures and the appropriate standard.

5.7. Hazard prevention/control measures are removed (where appropriate).



International House, 12 Constance Street, London, United Kingdom,
E16 2DQ

Company # 11483120

Benefits You Get

  • Free Turnitin Report
  • Unlimited Revisions
  • Installment Plan
  • 24/7 Customer Support
  • Plagiarism Free Guarantee
  • 100% Confidentiality
  • 100% Satisfaction Guarantee
  • 100% Money-Back Guarantee
  • On-Time Delivery Guarantee
FLAT 50% OFF ON EVERY ORDER. Use "FLAT50" as your promo code during checkout