0% Plagiarism Guaranteed & Custom Written

You are a Chief Engineer on a large tanker 180,000 Dwt installed with large slow speed

01 / 10 / 2021 Mechanical engineering

This paper circulates around the core theme of You are a Chief Engineer on a large tanker 180,000 Dwt installed with large slow speed together with its essential aspects. It has been reviewed and purchased by the majority of students thus, this paper is rated 4.8 out of 5 points by the students. In addition to this, the price of this paper commences from £ 99. To get this paper written from the scratch, order this assignment now. 100% confidential, 100% plagiarism-free.

You are a Chief Engineer on a large tanker 180,000 Dwt installed with large slow speed engine directly coupled to the propeller. You may choose any slow speed engine of your choice, and you need to mention the specifications of the chosen engine. The vessel is classed by NK Class, Japan, who permit Chief Engineer to carry out survey, which will be endorsed by NK, subject to verification of a Chief Engineer’s report.( You may choose a different Classification Society of your choice, if you so desire). You are required to open up the following machinery for a class survey, assuming a port stay of 5 days on this occasion. 01. One cylinder unit complete which includes the cylinder head mountings, Liner, Piston, Piston rod and gland. 02. One Cross head pin and bearing complete. 03. One Connecting rod pin bearing complete 04. One Main bearing and journal. Prepare a detailed report of the above survey undertaken.




International House, 12 Constance Street, London, United Kingdom,
E16 2DQ

Company # 11483120

Benefits You Get

  • Free Turnitin Report
  • Unlimited Revisions
  • Installment Plan
  • 24/7 Customer Support
  • Plagiarism Free Guarantee
  • 100% Confidentiality
  • 100% Satisfaction Guarantee
  • 100% Money-Back Guarantee
  • On-Time Delivery Guarantee
FLAT 50% OFF ON EVERY ORDER. Use "FLAT50" as your promo code during checkout