This paper circulates around the core theme of Timesheet or other work record is completed together with its essential aspects. It has been reviewed and purchased by the majority of students thus, this paper is rated 4.8 out of 5 points by the students. In addition to this, the price of this paper commences from £ 99. To get this paper written from the scratch, order this assignment now. 100% confidential, 100% plagiarism-free.
Unit Sector
Not applicable.
Elements and Performance Criteria
ELEMENT S | PERFORMANCE CRITERIA |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1 | Determine berthing location | 1.1 | Contact is made with tram controller and depot staff, or information is obtained from an information board, to determine planned location for berthing tram |
1.2 | Directions of tram controller and depot staff are interpreted and followed |
2 | Berth and shut down an electric tram | 2.1 | Hazards are identified, risks are assessed and risk control measures are implemented |
2.2 | Electric tram is berthed in accordance with organisational and site requirements |
2.3 | Shut-down procedures are carried out in accordance with specifications and organisational requirements |
3 | Carry out post-operational checks | 3.1 | Visual and other checks are made of tram in accordance with workplace procedures |
3.2 | Identified faults and defects are fixed or reported and recorded in accordance with workplace procedures |
3.3 | Faulty and defective equipment that presents a safety risk is reported in accordance with workplace procedures and relevant regulations |
3.4 | Outcomes of post-operational checks are recorded in accordance with workplace procedures |
4 | Secure an electric tram | 4.1 | Brakes are applied in accordance with workplace procedures |
4.2 | Electric tram is secured in accordance with depot requirements |
5 | Complete post-operational paperwork | 5.1 | Timesheet or other work record is completed |
5.2 | Roster is checked for future work allocation |
5.3 | Issues and variations are discussed and resolved with roster clerk |
5.4 | All required documentation is completed in accordance with workplace procedures |
5.5 | All equipment is returned and stowed in accordance with workplace requirements |
5.6 | Electric tram records are completed in accordance with workplace procedures and regulatory requirements |