The cost to prepare bottom-up estimates will typically run how much more than the costs to prepare the top-down estimates?

01 / 10 / 2021 Assignment

This paper circulates around the core theme of The cost to prepare bottom-up estimates will typically run how much more than the costs to prepare the top-down estimates? together with its essential aspects. It has been reviewed and purchased by the majority of students thus, this paper is rated 4.8 out of 5 points by the students. In addition to this, the price of this paper commences from £ 99. To get this paper written from the scratch, order this assignment now. 100% confidential, 100% plagiarism-free.

1) The cost to prepare bottom-up estimates
will typically run how much more than the costs to prepare the top-down
estimates?
A. About the same
B. About twice as much
C. About three times as much
D. About four times as much
E. About five times as much
2) Resource shortages, in the form of people, equipment, or materials, is a
good example of
A. Hidden interaction costs
B. Things going wrong on a project
C. Normal conditions not applying
D. Changes in project scope
E. None of these are correct
3) The accuracy of top-down estimates will typically be in the range of
A. Minus 50% to plus 50%
B. Minus 0% to plus 75%
C. Minus 20% to plus 60%
D. Minus 35% to plus 35%
E. Minus 10% to plus 30%
4) Design flaws being revealed after the fact, extreme weather conditions, and
accidents occurring are examples of:
A. Hidden interaction costs
B. Things going wrong on a project
C. Normal conditions not applying
D. Changes in project scope
E. None of these are correct
5) In practice, estimating processes are frequently classified as
A. Top down/bottom up
B. Rough/polished
C. Precise/order of magnitude
D. Draft/final
E. Both A and B are correct
6) Which of the following is a good condition for top-down estimating?
A. Cost and time important
B. Fixed price contract
C. Customer wants details
D. Internal, small project
E. All of these are good conditions for top-down estimating
7) Janet is forecasting how much money her department needs to support a new
project. She estimates that two people and $25,000 in expenses will cover her
needs. Because management typically insists on reducing forecasts by 20
percent, she increases her estimates to allow for that reduction. Which of the
following factors is illustrated in this situation?
A. Padding estimates
B. Planning horizon
C. Project structure
D. People
E. Organization culture
8) A/an _________ activity has more than one dependency arrow flowing from it.
A. Parallel
B. Critical path
C. Burst
D. Merge
E. Independent
9) ________ activities are to be completed immediately following a particular
activity.
A. Merge
B. Burst
C. Predecessor
D. Successor
E. Critical
10) When translated into a project network, a work package will become
A. A single activity
B. One or more activities
C. A milestone
D. A critical path
E. An arrow
11) Activities which can take place at the same time are termed
A. Parallel activity
B. Critical path
C. Burst activity
D. Merge activity
E. Independent activity
12) The minimum amount of time a dependent activity must be delayed to begin or
end is referred to as:
A. Hammock
B. Laddering
C. Lag
D. Cushion
E. Buffer
13) The minimum amount of time a dependent activity must be delayed to begin or
end is referred to as:
A. Hammock
B. Laddering
C. Lag
D. Cushion
E. Buffer
14) Which of the following is not one of the steps in the risk management
process?
A. Risk response development
B. Risk assessment
C. Risk identification
D. Risk tracking
E. Risk response control
15) One of the keys to success in risk identification is
A. Critical thinking
B. Optimism
C. Pessimism
D. A “can do” attitude
E. All of these are correct
16) The 1999 NASA Mars Climate Orbiter is an example of
A. Disaster avoidance through proactive risk management
B. Murphy’s Law
C. Proper use of critical thinking
D. Mismanaged risk control
E. Using historical records to assess risk
17) A list of questions that address traditional areas of uncertainty on a
project is termed a risk
A. Risk profile
B. Questionnaire
C. Research
D. Query
E. Checklist
18) One common mistake made early in the risk identification process is to
A. Not all possibilities are considered
B. Participants are over-optimistic
C. Participants are over-pessimistic
D. Focus on objectives and not on the events that could produce consequences.
E. Too much attention is given to past events
19) In the beginning the focus of risk management should be on risks that
A. Impact the whole project
B. Impact the critical path
C. Are known
D. Have the greatest cost impact
E. Have the greatest schedule impact
20) More common problems associated with managing multiproject resources
include all of the following except
A. Inefficient resource utilization
B. Delays in one project cause delays in other projects
C. Reducing “downtime” created by lack of tasks to perform
D. Resource bottlenecks
E. All of these are common problems
21) Which of the following is not one of the types of project constraints?
A. Physical
B. Technical
C. Resource
D. Time
E. All of these are types of project constraints
22) In a resource-constrained project, the first priority in assigning
resources is usually given to activities with the
A. Smallest duration
B. Least slack
C. Most slack
D. Lowest identification number
E. Highest cost
23) . If resources are not adequate to meet peak demands, the resulting reschedule
is termed
A. Resource-constrained scheduling
B. Time-constrained scheduling
C. Mandatory leveling
D. Project resource adjustment
E. Allocation
24) Susan is to conduct environmental testing but the chamber cannot hold all
the equipment that she wants to test. This is an example of a _________
constraint.
A. Physical
B. Technical
C. Resource
D. Scheduling
E. Time
25) . In a resource-constrained project the third priority in assigning
resources is usually given to activities with the
A. Smallest duration
B. Least slack
C. Most slack
D. Lowest identification number
E. Highest cost



International House, 12 Constance Street, London, United Kingdom,
E16 2DQ

Company # 11483120

Benefits You Get

  • Free Turnitin Report
  • Unlimited Revisions
  • Installment Plan
  • 24/7 Customer Support
  • Plagiarism Free Guarantee
  • 100% Confidentiality
  • 100% Satisfaction Guarantee
  • 100% Money-Back Guarantee
  • On-Time Delivery Guarantee
FLAT 50% OFF ON EVERY ORDER. Use "FLAT50" as your promo code during checkout