0% Plagiarism Guaranteed & Custom Written

Stable electric passenger train On arrival at stabling location, train is secured and brakes are cut out/isolated

01 / 10 / 2021 Essay Updates

This paper circulates around the core theme of Stable electric passenger train On arrival at stabling location, train is secured and brakes are cut out/isolated together with its essential aspects. It has been reviewed and purchased by the majority of students thus, this paper is rated 4.8 out of 5 points by the students. In addition to this, the price of this paper commences from £ 99. To get this paper written from the scratch, order this assignment now. 100% confidential, 100% plagiarism-free.

Unit Sector

Not applicable.

Elements and Performance Criteria

ELEMENTS 

PERFORMANCE CRITERIA 

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1 

Conduct pre-stabling checks 

1.1

Train stabling requirements are confirmed through workplace documents and/or relevant personnel

1.2

Hazards are identified, risks are assessed and risk control measures are implemented

1.3

Location safety requirements are identified and followed in accordance with workplace procedures

2 

Stable electric passenger train 

2.1

Train is shunted and/or stabled in accordance with workplace instructions and procedures

2.2

Communications protocols are established and performed in accordance with workplace requirements as required

2.3

On arrival at stabling location, train is secured and brakes are cut out/isolated

2.4

Visual inspection of train is conducted in accordance with workplace requirements

3 

Conduct post-stabling checks 

3.1

Post-operational checks of train are conducted in accordance with workplace procedures

3.2

Problems and defects are identified and reported/rectified in accordance with workplace procedures, regulatory requirements and manufacturer instructions as required

3.3

Safety devices are activated or put in position to ensure safety of personnel and equipment as required

3.4

Reporting/documentation is completed in accordance with workplace procedures as required



International House, 12 Constance Street, London, United Kingdom,
E16 2DQ

Company # 11483120

Benefits You Get

  • Free Turnitin Report
  • Unlimited Revisions
  • Installment Plan
  • 24/7 Customer Support
  • Plagiarism Free Guarantee
  • 100% Confidentiality
  • 100% Satisfaction Guarantee
  • 100% Money-Back Guarantee
  • On-Time Delivery Guarantee
FLAT 50% OFF ON EVERY ORDER. Use "FLAT50" as your promo code during checkout