0% Plagiarism Guaranteed & Custom Written

Prior to coupling trains, safety requirements are ensured

01 / 10 / 2021 Essay Updates

This paper circulates around the core theme of Prior to coupling trains, safety requirements are ensured together with its essential aspects. It has been reviewed and purchased by the majority of students thus, this paper is rated 4.8 out of 5 points by the students. In addition to this, the price of this paper commences from £ 99. To get this paper written from the scratch, order this assignment now. 100% confidential, 100% plagiarism-free.

Unit Sector

Not applicable.

Elements and Performance Criteria

ELEMENT S 

PERFORMANCE CRITERIA 

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1 

Plan and prepare for shunting operation 

1.1

Shunting requirements are confirmed through workplace documents and/or relevant personnel

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Local safety requirements are identified and followed in accordance with workplace procedures

1.4

Relevant work health and safety (WHS)/occupational health and safety (OHS) requirements are followed to prevent injury and damage

2 

Shunt trains 

2.1

Points, levers and/or switches are operated as required in accordance with workplace requirements

2.2

Audible signals, hand signals and other line of sight communications are used to assist the control of train movements

2.3

Hand, light and radio shunting commands are responded to in accordance with workplace requirements

2.4

Pre-movement inspection/tests are carried out prior to moving trains

2.5

Train is shunted and positioned in accordance with operational/workplace requirements

2.6

Train is secured after shunt movement in accordance with workplace requirements

3 

Couple trains 

3.1

Type of connections required are identified prior to coupling

3.2

Trains to be coupled are positioned in accordance with operating procedures and workplace requirements

3.3

Trains to be coupled are fully secured

3.4

Alignment of couplers in the appropriate position for type of connection required is ensured

3.5

Prior to coupling trains, safety requirements are ensured

3.6

Trains are coupled in accordance with operating procedures and workplace requirements

3.7

Post-coupling inspection/tests are carried out in accordance with operating procedures and workplace requirements

4 

Uncouple trains 

4.1

Trains to be uncoupled are identified and pre-uncoupling checks and, as required, procedures, are conducted in accordance with operating procedures and workplace requirements

4.2

Prior to uncoupling trains, safety requirements are ensured

4.3

Train to remain after uncoupling is fully secured

4.4

Trains are uncoupled in accordance with operating procedures and workplace requirements

4.5

Post-uncoupling inspection/tests are carried out in accordance with operating procedures and workplace requirements



International House, 12 Constance Street, London, United Kingdom,
E16 2DQ

Company # 11483120

Benefits You Get

  • Free Turnitin Report
  • Unlimited Revisions
  • Installment Plan
  • 24/7 Customer Support
  • Plagiarism Free Guarantee
  • 100% Confidentiality
  • 100% Satisfaction Guarantee
  • 100% Money-Back Guarantee
  • On-Time Delivery Guarantee
FLAT 50% OFF ON EVERY ORDER. Use "FLAT50" as your promo code during checkout