ELEMENT S | PERFORMANCE CRITERIA |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1 | Prepare for monorail train operations | 1.1 | Driving requirement is identified and confirmed from roster, shift card or other authorised documentation |
1.2 | Sign-on/log-on procedures at the depot are completed and monorail train to be operated is correctly identified |
1.3 | Essential equipment is identified and obtained |
2 | Operate and monitor monorail train in normal operational mode | 2.1 | Monorail train is operated within specifications and organisational requirements to meet required schedules and special services |
2.2 | On-board equipment is confirmed as being serviceable, and is operated in accordance with specifications and organisation requirements |
2.3 | Warning devices and gauges are monitored and responded to in accordance with organisational requirements |
2.4 | Operational restrictions established by the organisation and relevant legislation are observed |
2.5 | Monorail train is stopped in designated and approved locations and within limitations, to permit safe embarkation and alighting of all passengers |
3 | Operate monorail train in abnormal situations | 3.1 | In an abnormal situation, Network Control Officer is contacted and their instructions are requested |
3.2 | Appropriate mode of operation is selected and implemented when authorised by Network Control Officer |
3.3 | All instructions from Network Control Officer are followed |
4 | Monitor on-board equipment | 4.1 | Equipment is monitored to maintain optimum running conditions and to identify faults, defects and deficiencies |
4.2 | Appropriate action is taken in response to identified faults, defects and deficiencies to ensure safe operation of monorail train, including communications with Network Control Officer as necessary |
4.3 | Faults, defects and deficiencies are assessed as instructed by Network Control Officer, to determine risk of damage to equipment or injury to personnel |
4.4 | Defects are reported and/or recorded |
5 | Communicate with Network Control Officer | 5.1 | Regular communication is maintained with Network Control Officer when operating monorail train in accordance with workplace procedures and regulatory requirements |
5.2 | Network Control Officer is advised of operational problems, delays, safety incidents and emergency situations |
5.3 | Relevant information provided by Network Control Officer is interpreted and applied to driving activities in accordance with workplace procedures and applicable regulatory requirements |
6 | Follow all applicable regulatory requirements | 6.1 | Regulatory requirements applicable to operating monorail train are accessed and interpreted |
6.2 | Relevant regulatory requirements are applied and followed when operating monorail train |