0% Plagiarism Guaranteed & Custom Written
Irregularities and load contamination are identified and appropriate action is taken in accordance with organisational and/or network owner policies and procedures
01 / 10 / 2021
Essay Updates
This paper circulates around the core theme of Irregularities and load contamination are identified and appropriate action is taken in accordance with organisational and/or network owner policies and procedures together with its essential aspects. It has been reviewed and purchased by the majority of students thus, this paper is rated 4.8 out of 5 points by the students. In addition to this, the price of this paper commences from £ 99. To get this paper written from the scratch, order this assignment now. 100% confidential, 100% plagiarism-free.
Unit Sector
Not applicable.
Elements and Performance Criteria
ELEMENT S | PERFORMANCE CRITERIA |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1 | Prepare for general train examination | 1.1 | Location of examination and information about items to be examined are obtained and activities are planned |
1.2 | Materials, documentation and equipment required for the examination are identified, obtained and prepared for use |
1.3 | Hazards are identified, risks are assessed and risk control measures are implemented |
1.4 | Examination is started at planned time and location to minimise delays to train availability |
1.5 | Train identification and status is confirmed and required actions are taken to ensure train remains safe for duration of examination |
1.6 | Individual responsibilities required to complete examination are agreed with relevant personnel |
1.7 | Conditions are assessed and necessary actions are taken to ensure examination is effective |
2 | Undertake general train examination | 2.1 | Examination is undertaken in accordance with organisational procedures |
2.2 | Communication is maintained with relevant personnel to ensure safe, efficient and complete examination |
2.3 | Condition of rolling stock, couplings and load are examined and dimensions are confirmed appropriate to wagon type and gauge outline requirements |
2.4 | Irregularities and load contamination are identified and appropriate action is taken in accordance with organisational and/or network owner policies and procedures |
2.5 | Obvious wagon or carriage faults and their locations are reported in accordance with organisational policies and procedures |
2.6 | Apparent problems are investigated further and corrected where possible |
3 | Report examination results | 3.1 | Conditions requiring urgent action are reported in accordance with organisational policies and procedures, and appropriate action is taken to initiate immediate response |
3.2 | Relevant personnel are informed of remedial or other action required prior to completion of examination
|