0% Plagiarism Guaranteed & Custom Written
Instructions concerning tram operation are given to relevant personnel to ensure safe and efficient running
01 / 10 / 2021
Essay Updates
This paper circulates around the core theme of Instructions concerning tram operation are given to relevant personnel to ensure safe and efficient running together with its essential aspects. It has been reviewed and purchased by the majority of students thus, this paper is rated 4.8 out of 5 points by the students. In addition to this, the price of this paper commences from £ 99. To get this paper written from the scratch, order this assignment now. 100% confidential, 100% plagiarism-free.
Unit Sector
Not applicable.
Elements and Performance Criteria
ELEMENT S | PERFORMANCE CRITERIA |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1 | Operate tram efficiently and effectively | 1.1 | Electric tram is operated in accordance with relevant codes of practice, workplace procedures and instructions |
1.2 | Electric tram is operated safely in accordance with traffic regulations |
1.3 | Electric tram is operated with due care of the vehicle |
1.4 | Movements are made within limits of vehicle and road dimensions, in accordance with specifications |
1.5 | Smooth and controlled movements are made |
1.6 | Electric tram performance is monitored to maintain optimum running condition and to identify faults, defects and efficiencies in accordance with organisational requirements |
2 | Drive tram | 2.1 | Traffic flows are anticipated and appropriate defensive action is taken to maintain the efficiency of tram operation |
2.2 | Electric tram is constantly monitored for malfunctions or factors that may affect tram performance |
3 | Complete tram journey | 3.1 | Tram documentation is received, interpreted and followed |
3.2 | Electric tram is operated and manoeuvred in accordance with tram documentation and procedures |
3.3 | Events and circumstances affecting planned running schedule are communicated to relevant personnel en route |
3.4 | Tram control and other instructions are received, interpreted and applied to ensure safe and effective control of the tram |
3.5 | Communications are maintained with tram controllers during tram journey in accordance with relevant organisational requirements |
3.6 | Instructions concerning tram operation are given to relevant personnel to ensure safe and efficient running |
4 | Respond effectively to external operating factors | 4.1 | Instructions are verified as required, interpreted and followed, in accordance with relevant regulatory requirements and organisational policies and procedures, to ensure that actions taken are appropriate and safe |
4.2 | Fixed traffic and hand signals, and verbal movement commands are interpreted and followed, in accordance with regulatory requirements and organisational policies and procedures, to ensure actions taken are appropriate and safe |
4.3 | Hazardous situations are recognised and appropriate action is taken to minimise risk to personnel and equipment |