0% Plagiarism Guaranteed & Custom Written

Inspection is made of motive power unit in accordance with workplace procedures

01 / 10 / 2021 Essay Updates

This paper circulates around the core theme of Inspection is made of motive power unit in accordance with workplace procedures together with its essential aspects. It has been reviewed and purchased by the majority of students thus, this paper is rated 4.8 out of 5 points by the students. In addition to this, the price of this paper commences from £ 99. To get this paper written from the scratch, order this assignment now. 100% confidential, 100% plagiarism-free.

Unit Sector

Not applicable.

Elements and Performance Criteria

ELEMENTS 

PERFORMANCE CRITERIA 

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1 

Determine stabling location 

1.1

Contact is made with network control officer and yard staff to determine planned location for stabling a motive power unit

1.2

Directions of network control officer and yard staff are interpreted and followed

1.3

Care is taken to keep clear of other roads

2 

Stable heritage motive power unit 

2.1

Hazards are identified, risks are assessed and risk control measures are implemented

2.2

Train is shunted and secured in accordance with directions, workplace procedures and rail regulations

2.3

Motive power unit is stabled as directed

2.4

Derailers are set in place in accordance with workplace procedures and rail regulations

2.5

Handbrakes are applied

2.6

Power brakes are applied

2.7

Motive power unit is shut down in accordance with manufacturer instructions and workplace procedures

2.8

Cab is secured in accordance with workplace procedures

3 

Carry out post-operational checks 

3.1

Fuel and fluid levels are checked and required action is taken to replenish them

3.2

Inspection is made of motive power unit in accordance with workplace procedures

3.3

Identified faults and defects are fixed or reported and recorded in accordance with workplace procedures

3.4

Faulty and defective equipment that presents a safety risk is isolated and tagged in accordance with workplace procedures and rail regulations

3.5

Outcomes of post-operational checks are recorded in accordance with workplace procedures

4 

Complete post-operational paperwork 

4.1

Required safeworking documentation is completed in accordance with workplace procedures and rail regulations

4.2

Equipment is returned and stowed in accordance with workplace requirements



International House, 12 Constance Street, London, United Kingdom,
E16 2DQ

Company # 11483120

Benefits You Get

  • Free Turnitin Report
  • Unlimited Revisions
  • Installment Plan
  • 24/7 Customer Support
  • Plagiarism Free Guarantee
  • 100% Confidentiality
  • 100% Satisfaction Guarantee
  • 100% Money-Back Guarantee
  • On-Time Delivery Guarantee
FLAT 50% OFF ON EVERY ORDER. Use "FLAT50" as your promo code during checkout