0% Plagiarism Guaranteed & Custom Written

Examination is started at planned time and location to minimise delays to train availability

01 / 10 / 2021 Essay Updates

This paper circulates around the core theme of Examination is started at planned time and location to minimise delays to train availability together with its essential aspects. It has been reviewed and purchased by the majority of students thus, this paper is rated 4.8 out of 5 points by the students. In addition to this, the price of this paper commences from £ 99. To get this paper written from the scratch, order this assignment now. 100% confidential, 100% plagiarism-free.

Unit Sector

Not applicable.

Elements and Performance Criteria

ELEMENT S 

PERFORMANCE CRITERIA 

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1 

Prepare for general train examination 

1.1

Location of examination and information about items to be examined are obtained and activities are planned

1.2

Materials, documentation and equipment required for the examination are identified, obtained and prepared for use

1.3

Hazards are identified, risks are assessed and risk control measures are implemented

1.4

Examination is started at planned time and location to minimise delays to train availability

1.5

Train identification and status is confirmed and required actions are taken to ensure train remains safe for duration of examination

1.6

Individual responsibilities required to complete examination are agreed with relevant personnel

1.7

Conditions are assessed and necessary actions are taken to ensure examination is effective

2 

Undertake general train examination 

2.1

Examination is undertaken in accordance with organisational procedures

2.2

Communication is maintained with relevant personnel to ensure safe, efficient and complete examination

2.3

Condition of rolling stock, couplings and load are examined and dimensions are confirmed appropriate to wagon type and gauge outline requirements

2.4

Irregularities and load contamination are identified and appropriate action is taken in accordance with organisational and/or network owner policies and procedures

2.5

Obvious wagon or carriage faults and their locations are reported in accordance with organisational policies and procedures

2.6

Apparent problems are investigated further and corrected where possible

3 

Report examination results 

3.1

Conditions requiring urgent action are reported in accordance with organisational policies and procedures, and appropriate action is taken to initiate immediate response

3.2

Relevant personnel are informed of remedial or other action required prior to completion of examination



International House, 12 Constance Street, London, United Kingdom,
E16 2DQ

Company # 11483120

Benefits You Get

  • Free Turnitin Report
  • Unlimited Revisions
  • Installment Plan
  • 24/7 Customer Support
  • Plagiarism Free Guarantee
  • 100% Confidentiality
  • 100% Satisfaction Guarantee
  • 100% Money-Back Guarantee
  • On-Time Delivery Guarantee
FLAT 50% OFF ON EVERY ORDER. Use "FLAT50" as your promo code during checkout