0% Plagiarism Guaranteed & Custom Written

Determine stabling location 1.1 Contact is made with appropriate personnel to determine planned location for stabling train and/or motive power unit

01 / 10 / 2021 Essay Updates

This paper circulates around the core theme of Determine stabling location 1.1 Contact is made with appropriate personnel to determine planned location for stabling train and/or motive power unit together with its essential aspects. It has been reviewed and purchased by the majority of students thus, this paper is rated 4.8 out of 5 points by the students. In addition to this, the price of this paper commences from £ 99. To get this paper written from the scratch, order this assignment now. 100% confidential, 100% plagiarism-free.

Unit Sector

Not applicable.

Elements and Performance Criteria

ELEMENT S 

PERFORMANCE CRITERIA 

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1 

Determine stabling location 

1.1

Contact is made with appropriate personnel to determine planned location for stabling train and/or motive power unit

1.2

Location is identified and confirmed with appropriate personnel

1.3

Directions from appropriate personnel are interpreted and followed

2 

Stable motive power unit 

2.1

Train is shunted and secured to prevent roll away in accordance with directions and workplace procedures

2.2

Motive power unit is stabled as directed

2.3

Motive power unit is secured to prevent roll away, in accordance with directions and workplace procedures

2.4

Motive power unit is shut down in accordance with manufacturer instructions and workplace procedures

2.5

Cab is secured in accordance with workplace procedures

2.6

Derailers are set in place in accordance with workplace procedures as required

3 

Carry out post-operational checks 

3.1

Fuel and fluid levels are checked and required action is taken to replenish consumables

3.2

Inspection is made of motive power unit in accordance with workplace procedures

3.3

Identified faults and defects are fixed and/or reported and recorded in accordance with workplace procedures

3.4

Faulty and defective equipment that presents a safety risk is isolated and tagged in accordance with workplace procedures and rail regulations

3.5

Outcomes of post-operational checks are recorded in accordance with workplace procedures

3.6

Equipment is returned and stowed in accordance with workplace requirements

3.7

Required safeworking and post-operational documentation is completed in accordance with workplace procedures and rail regulations



International House, 12 Constance Street, London, United Kingdom,
E16 2DQ

Company # 11483120

Benefits You Get

  • Free Turnitin Report
  • Unlimited Revisions
  • Installment Plan
  • 24/7 Customer Support
  • Plagiarism Free Guarantee
  • 100% Confidentiality
  • 100% Satisfaction Guarantee
  • 100% Money-Back Guarantee
  • On-Time Delivery Guarantee
FLAT 50% OFF ON EVERY ORDER. Use "FLAT50" as your promo code during checkout