0% Plagiarism Guaranteed & Custom Written

Defective rolling stock not fit to run is identified and detachment arrangements are made in compliance with workplace procedures

01 / 10 / 2021 Essay Updates

This paper circulates around the core theme of Defective rolling stock not fit to run is identified and detachment arrangements are made in compliance with workplace procedures together with its essential aspects. It has been reviewed and purchased by the majority of students thus, this paper is rated 4.8 out of 5 points by the students. In addition to this, the price of this paper commences from £ 99. To get this paper written from the scratch, order this assignment now. 100% confidential, 100% plagiarism-free.

Unit Sector

Not applicable.

Elements and Performance Criteria

ELEMENT S 

PERFORMANCE CRITERIA 

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1 

Plan and prepare for train brake inspection and testing 

1.1

Brake test documentation, rolling stock data and other relevant reports are read and clarified as required to confirm required action

1.2

Appropriate tools and equipment are obtained as required and checked prior to inspection

1.3

Work health and safety (WHS)/occupational health and safety (OHS) legislation, codes of practice, policies and procedures are identified and followed

1.4

Hazards are identified, risks are assessed and risk control measures are implemented

1.5

Train is isolated or secured in accordance with workplace procedures to make the work area safe for inspection

2 

Inspect and test train brake operation 

2.1

Brake leakage test is conducted to ensure compliance with required standards

2.2

Modified brake tests are conducted to ensure compliance with required standards

2.3

Air continuity test is conducted to ensure train braking system meets functional specifications

2.4

Brakes are applied and released to ensure train braking system meets functional specifications

2.5

Hoses and pipe components are inspected for defects requiring repair or replacement

2.6

Defects and faults are identified and rolling stock is carded

3 

Deal with identified faults 

3.1

Plans and/or procedures for replacement or repair of identified defective components are implemented in accordance with workplace procedures and manufacturer specifications

3.2

Confirmation/verification of minor repairs or replacements is obtained

3.3

Defective rolling stock not fit to run is identified and detachment arrangements are made in compliance with workplace procedures

4 

Record test results 

4.1

Brake test records are completed to reflect inspection results in accordance with workplace policies and procedures

4.2

Records are filed in accordance with workplace policies and procedures



International House, 12 Constance Street, London, United Kingdom,
E16 2DQ

Company # 11483120

Benefits You Get

  • Free Turnitin Report
  • Unlimited Revisions
  • Installment Plan
  • 24/7 Customer Support
  • Plagiarism Free Guarantee
  • 100% Confidentiality
  • 100% Satisfaction Guarantee
  • 100% Money-Back Guarantee
  • On-Time Delivery Guarantee
FLAT 50% OFF ON EVERY ORDER. Use "FLAT50" as your promo code during checkout