0% Plagiarism Guaranteed & Custom Written

Brake test is conducted on each train section with assistance from appropriate personnel

01 / 10 / 2021 Essay Updates

This paper circulates around the core theme of Brake test is conducted on each train section with assistance from appropriate personnel together with its essential aspects. It has been reviewed and purchased by the majority of students thus, this paper is rated 4.8 out of 5 points by the students. In addition to this, the price of this paper commences from £ 99. To get this paper written from the scratch, order this assignment now. 100% confidential, 100% plagiarism-free.

Unit Sector

Not applicable.

Elements and Performance Criteria

ELEMENT S 

PERFORMANCE CRITERIA 

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1 

Position equipment and motive power unit/s 

1.1

Remote control equipment and motive power units are positioned in required locations

1.2

Brake test is conducted on each train section with assistance from appropriate personnel

1.3

Front and rear train consists are coupled together to form one train, in accordance with safeworking techniques

1.4

Relevant work health and safety (WHS)/occupational health and safety (OHS) requirements are followed to prevent injury and damage

1.5

Relevant codes of practice, and safeworking systems and requirements are followed

2 

Monitor and operate remote control equipment 

2.1

Motive power units and control system set-up are checked to ensure safe operational status

2.2

Remote control equipment is operated and monitored in accordance with operational requirements during train movements to provide safe train handling and control

2.3

Operational difficulties encountered are addressed by re-establishing control of the motive power unit/s with minimum risk to personnel and equipment

3 

Shut down remote control equipment 

3.1

Shut-down procedures of lead and remote control equipment are followed to ensure train security and de-activation of the system

3.2

Equipment indicators or functions are operated to ensure shut-down process is correct and complete



International House, 12 Constance Street, London, United Kingdom,
E16 2DQ

Company # 11483120

Benefits You Get

  • Free Turnitin Report
  • Unlimited Revisions
  • Installment Plan
  • 24/7 Customer Support
  • Plagiarism Free Guarantee
  • 100% Confidentiality
  • 100% Satisfaction Guarantee
  • 100% Money-Back Guarantee
  • On-Time Delivery Guarantee
FLAT 50% OFF ON EVERY ORDER. Use "FLAT50" as your promo code during checkout