ELEMENTS | PERFORMANCE CRITERIA |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1 | Plan and prepare electric tram | 1.1 | Roster is checked and interpreted for day’s tram driving activities |
1.2 | Allocation of electric trams is checked in conjunction with tram controllers and roster clerk |
1.3 | Electric tram inspection and preparation duties are identified and interpreted |
1.4 | Tram schedules, notices and other operational and regulatory documentation are accessed and interpreted in accordance with workplace procedures |
1.5 | Communications equipment required for the day’s operations is obtained and checked to ensure it is functional |
1.6 | Hazards are identified, risks are assessed and risk control measures are implemented |
1.7 | Required personal protective equipment is obtained for use prior to tram driving activities |
1.8 | Electric tram to be inspected and prepared is located in the depot |
1.9 | Depot safety and basic electrical equipment awareness procedures are followed while locating tram in the depot |
2 | Visually inspect and prepare electric tram | 2.1 | Features, functions and location of electric tram and associated equipment are identified |
2.2 | Logbook is checked to confirm serviceability of unit |
2.3 | Pre-start internal and external safety and maintenance checks are conducted, in accordance with work health and safety (WHS)/occupational health and safety (OHS) and other workplace policies and procedures |
2.4 | Electric tram and equipment are checked visually, and defects and deficiencies are recorded and rectified, isolated, tagged or reported as required, in accordance with workplace procedures and regulatory requirements |
2.5 | Availability of traction power and sand are checked against journey requirements as required, in accordance with workplace procedures and regulatory requirements |
2.6 | Relevant WHS/OHS and regulatory requirements are followed |
2.7 | Documentation for electric tram inspection and preparation results is completed in accordance with workplace procedures |
3 | Conduct on-tram checks | 3.1 | Electric tram is checked in correct sequence and all lights are confirmed as operating to optimum requirements |
3.2 | Pre-departure mechanical checks are correctly performed and correct functioning of all equipment is confirmed in accordance with workplace procedures and manufacturer operating requirements |
3.3 | Supervisory controls and indicators are checked to ensure they are functioning correctly and appropriate action is taken if they are not working correctly |
3.4 | Communications equipment is checked to ensure it is functioning correctly and appropriate action is taken if it is not working correctly |
3.5 | Seat, windows, blinds and other personal in-cab equipment are checked and adjusted for correct functionality, safety and comfort |
3.6 | Ancillary equipment is checked and is confirmed to be operational in accordance with operating requirements |
3.7 | Fire extinguisher, point bars and any other required tools are checked to confirm they are in position |
4 | Start electric tram | 4.1 | Electric tram is started in accordance with instructions and any operating faults are recognised, diagnosed, reported and recorded in appropriate records for follow-up |
4.2 | Where critical or serious equipment faults cannot be readily rectified, electric tram is shut down and reported for rectification in accordance with procedures |
4.3 | Instruments and gauges are observed and readings are interpreted to confirm effective operation |
4.4 | Action is taken to determine cause of identified problem in instruments and gauges, and situation is rectified or reported, as required |
4.5 | Sand operation is checked after starting and appropriate action is taken as required if not effectively functioning |
4.6 | Pre-departure checks are carried out to ensure electric tram is braking and powering effectively and is safe to move |
5 | Position electric tram | 5.1 | Authority to move and position electric tram is obtained and relevant personnel are advised of intention and procedures |
5.2 | Electric tram is positioned in accordance with operational requirements and directions |
5.3 | Tram performance is monitored during operation to confirm effective operation or to identify defects |
5.4 | Equipment defects are identified, rectified and recorded or relevant personnel are advised for assistance |
5.5 | Relevant WHS/OHS and regulatory requirements are followed to ensure safety and to prevent injury and damage |
5.6 | Relevant personnel are advised electric tram is secured in required position and is ready for service |
5.7 | Required documentation concerning inspecting, preparing and starting up electric tram is completed and processed in accordance with workplace procedures |