0% Plagiarism Guaranteed & Custom Written

1 Identify yard or siding structures, layout and terminology 1.1 Terminology for track, trackside equipment and fixed structures is identified

01 / 10 / 2021 Essays & Coursework 1

This paper circulates around the core theme of 1 Identify yard or siding structures, layout and terminology 1.1 Terminology for track, trackside equipment and fixed structures is identified together with its essential aspects. It has been reviewed and purchased by the majority of students thus, this paper is rated 4.8 out of 5 points by the students. In addition to this, the price of this paper commences from £ 99. To get this paper written from the scratch, order this assignment now. 100% confidential, 100% plagiarism-free.



Unit Sector

Not applicable.

Elements and Performance Criteria

ELEMENT S 

PERFORMANCE CRITERIA 

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1 

Identify yard or siding structures, layout and terminology 

1.1

Terminology for track, trackside equipment and fixed structures is identified

1.2

Features of track, including geography and geometry are identified

1.3

Infrastructure categories and their purpose are identified

1.4

Other principal structure types and their purpose are identified

1.5

Relevant stakeholders for reporting structural faults or anomalies to, are identified

2 

Identify above and below ground services 

2.1

Principal overhead and/or electrical components and their purpose are identified and explained

2.2

Power supply voltages are identified

2.3

Methods of isolation are identified and their purpose is explained

3 

Identify rail track vehicles and rolling stock 

3.1

Types of trains and rolling stock are identified

3.2

Types of rail track vehicles are identified

3.3

Relevant stakeholders for reporting rolling stock faults or anomalies to, are identified

4 

Identify signals and safety devices 

4.1

Types, location and purpose of signals are identified

4.2

Types, location and purpose of safety devices are identified

4.3

Relevant stakeholders for reporting signal or safety device faults or anomalies to, are identified

5 

Identify primary rail activities and safety systems 

5.1

Primary rail activities and other operators are identified as required

5.2

Types and purpose of safety systems are identified

5.3

Relevant stakeholders for reporting safety events to, are identified



International House, 12 Constance Street, London, United Kingdom,
E16 2DQ

Company # 11483120

Benefits You Get

  • Free Turnitin Report
  • Unlimited Revisions
  • Installment Plan
  • 24/7 Customer Support
  • Plagiarism Free Guarantee
  • 100% Confidentiality
  • 100% Satisfaction Guarantee
  • 100% Money-Back Guarantee
  • On-Time Delivery Guarantee
FLAT 50% OFF ON EVERY ORDER. Use "FLAT50" as your promo code during checkout