0% Plagiarism Guaranteed & Custom Written

1 Establish purpose and function of rail safeworking systems 1.1 Relevant information is accessed and analysed

01 / 10 / 2021 Essays & Coursework 1

This paper circulates around the core theme of 1 Establish purpose and function of rail safeworking systems 1.1 Relevant information is accessed and analysed together with its essential aspects. It has been reviewed and purchased by the majority of students thus, this paper is rated 4.8 out of 5 points by the students. In addition to this, the price of this paper commences from £ 99. To get this paper written from the scratch, order this assignment now. 100% confidential, 100% plagiarism-free.

Unit Sector

Not applicable.

Elements and Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1 

Establish purpose and function of rail safeworking systems 

1.1

Relevant information is accessed and analysed

1.2

Purpose of rail safeworking rules and procedures are identified and explained

1.3

Methods for developing safeworking rules and procedures are identified and outlined

1.4

Types of safeworking systems, their functions and where they are used are explained

2 

Implement principles of rail safeworking systems 

2.1

Relevant information is accessed and analysed

2.2

Principles behind rail safeworking systems are identified and explained

2.3

Main elements of rail safeworking systems are identified and explained

2.4

Methods by which operations can continue in degraded situations are identified and outlined

2.5

Appropriate procedures are prepared to enable operations to continue in various degraded situations

3 

Implement principles of track protection systems 

3.1

Relevant information is accessed and analysed

3.2

Risks involved in working on or beside the track are identified, explained and managed

3.3

Purpose of track protection is identified and explained

3.4

Different methods of track protection are identified and outlined

3.5

Work is planned so that relevant track protection methods can be applied



International House, 12 Constance Street, London, United Kingdom,
E16 2DQ

Company # 11483120

Benefits You Get

  • Free Turnitin Report
  • Unlimited Revisions
  • Installment Plan
  • 24/7 Customer Support
  • Plagiarism Free Guarantee
  • 100% Confidentiality
  • 100% Satisfaction Guarantee
  • 100% Money-Back Guarantee
  • On-Time Delivery Guarantee
FLAT 50% OFF ON EVERY ORDER. Use "FLAT50" as your promo code during checkout