0% Plagiarism Guaranteed & Custom Written
1 Determine stabling location 1.1 Contact is made with Network Control Officer and yard staff to determine planned location for stabling a steam locomotive
01 / 10 / 2021
Essay Updates
This paper circulates around the core theme of 1 Determine stabling location 1.1 Contact is made with Network Control Officer and yard staff to determine planned location for stabling a steam locomotive together with its essential aspects. It has been reviewed and purchased by the majority of students thus, this paper is rated 4.8 out of 5 points by the students. In addition to this, the price of this paper commences from £ 99. To get this paper written from the scratch, order this assignment now. 100% confidential, 100% plagiarism-free.
Unit Sector
Not applicable.
Elements and Performance Criteria
ELEMENTS | PERFORMANCE CRITERIA |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1 | Determine stabling location | 1.1 | Contact is made with Network Control Officer and yard staff to determine planned location for stabling a steam locomotive |
1.2 | Directions of Network Control Officer and yard staff are interpreted and followed |
1.3 | Care is taken to keep clear of other roads |
2 | Stable and shut down heritage steam locomotive | 2.1 | Hazards are identified, risks are assessed and risk control measures are implemented |
2.2 | Carriages or vehicles are shunted and secured in accordance with directions, workplace procedures and rail regulations |
2.3 | Steam locomotive is stabled in correct location as directed |
2.4 | Derailers are set in place in accordance with workplace procedures and rail regulations |
2.5 | Handbrakes are applied |
2.6 | Park brakes are secured |
2.7 | Steam locomotive is stabled in accordance with operator instructions and workplace procedures |
2.8 | Cab is secured in accordance with workplace procedures |
3 | Carry out post-operational checks | 3.1 | Fluid and fuel levels are checked and any required action is taken to top up levels |
3.2 | Visual check is made of steam locomotive in accordance with workplace procedures |
3.3 | Identified faults and defects are fixed or reported and recorded in accordance with workplace procedures |
3.4 | Faulty and defective equipment that presents a safety risk is isolated and tagged in accordance with workplace procedures and rail regulations |
3.5 | Outcomes of post-operational checks are recorded in accordance with workplace procedures |
4 | Complete post-operational paperwork | 4.1 | Timesheet or other work record is completed |
4.2 | Roster is checked for future work allocation |
4.3 | Issues and variations are discussed and resolved with roster clerk |
4.4 | Required safeworking documentation and actions are completed in accordance with workplace procedures and rail regulations |
4.5 | Equipment is returned and stowed in accordance with workplace requirements |