This paper circulates around the core theme of 1 Background to Torrens Island power station – when it was opened, together with its essential aspects. It has been reviewed and purchased by the majority of students thus, this paper is rated 4.8 out of 5 points by the students. In addition to this, the price of this paper commences from £ 99. To get this paper written from the scratch, order this assignment now. 100% confidential, 100% plagiarism-free.
In your report please respond to the questions asked at the end of the presentation.
You also need to discuss the following:
1 Background to Torrens Island power station – when it was opened, how it has
changed, who it is run by etc.
2 Discuss power generation process in a steam power plant from gas to
electricity.
3 Discuss the steam power plant cycles used by Torrens Island i.e. Number of
turbines inclusion of regeneration, reheat, superheat etc. Draw the steam
turbine flow diagram including all the seven feedwater heaters.
4 Efficiency of Torrens Island Power Plant – what measures have been
introduced to improve overall efficiency what further improvements can you
suggest to improve efficiency.
5 How is the power plant operation and cycle efficiency controlled and
monitored?
6 Estimate the annual greenhouse gas emission from the Power station.
7 What are the other environmental impacts of Torrens Island Power Station?
What measures are used to reduce its environmental impacts, how can its
environmental impacts be further reduced?
8 Compare Torrens Island with other local and interstate power plants.
9 Carbon capture and storage is being developed as a means of reducing
global warming impact. Can it be integrated into Torrens Island? What are the
main requirements?
10 What happens during peak demand periods when our need for power is
greater than Torrens Island can provide?
11 The Repower Port Augusta Alliance (Beyond Zero Emissions report 2012)
produced a proposal to replace the retiring Northern (capacity 520 MW ) and
playford B (capacity 240 MW) brown coal power plants located in Port August with 6
solar thermal plants and 95 wind turbines. Compare this proposal against replacing
the power plants with combined gas power plant in terms of economic,
environmental and social benefit. What is your preferred option?
Estimate the following performance indicators for the steam cycle for one of the
200MW turbines at the Torrens Island power plant station. The typical TS diagram
for the turbine is given in the figure below.
1. The cycle efficiency
2. The isentropic efficiencies of the HP, IP and LP turbines