Shawl Corporation’s variable overhead is applied on the basis of direct labor-hours. The standard cost card for product F02E specifies 5.5 direct labor-hours per unit of  F02E. The standard variable overhead rate is $6.80 per direct labor-hour. During t

Shawl Corporation’s variable overhead is applied on the basis of direct labor-hours. The standard cost card for product F02E specifies 5.5 direct labor-hours per unit of F02E. The standard variable overhead rate is $6.80 per direct labor-hour. During t

Shawl Corporation’s variable overhead is applied on the basis of direct labor-hours. The standard cost card for product F02E specifies 5.5 direct labor-hours per unit of

F02E. The standard variable overhead rate is $6.80 per direct labor-hour. During the most recent month, 1,560 units of product F02E were made and 8,700 direct labor hours were worked.

The actual variable overhead incurred was $52,635.

Required:

A. What was the variable overhead rate variance for the month?

B. What was the variable overhead efficiency variance for the month?